Having decided to carry out the repairs of the apartment, most people, especially without experience, make many mistakes usually due to the lack of a clearly defined plan of work, as well as due to improper assessment of opportunities and efforts. The repair work should be carried out in accordance with the clearly drawn up plan:
– First of all, they carry out the most “dirty” work, which include the dismantling of flooring and walls, erosion of surfaces, as well as the removal of various debris, dirt and dust. In addition to dismantling at the first stage, windows are replaced, which is carried out immediately after the garbage is delivered.
– The second step involves the implementation of the floor screed, which is aimed at leveling the surface. The leveling of the surface should be carried out in most apartments, since the nature of irregularities is often significant. However, this nature of work is applicable to almost all surfaces of Russian apartments (ceilings, walls and floor).
– The next step of the European repair involves the wiring of heating pipes, water supply and electric network. This stage should be carried out with maximum attentiveness and responsibility, since in the future it will be extremely difficult to correct anything without dismantling the finished surfaces.
– Black finish implies plastering work on aligning the bases of the walls, as well as applying the finish coating. The pipes and wires located outside, as well as the irregularities of the walls, do not look quite beautiful, and therefore it is necessary to align and hide the communications.
– Finishing is the final stage of repair work. It begins with the installation of the doors, and ends with painting walls, ceilings, laying tiles, as well as installing various little things aimed at bringing the design to perfection.