The site before construction must be prepared. There are several stages in this process. First, the site is calculated, free access is prepared for it, find a place for the warehouse of building material and mount communications. A good start to ensure convenient construction is the arrangement of the road to the site. Keep in mind that large construction vehicles will drive along the road. The radius of rotation should be at least ten meters. This must be taken into account in the project. If the work is carried out in the winter, then you can not do without snowpock machines. By the way, now the yogurtnitsa is popular to buy Ukraine recommends it to everyone.
We proceed to the calculation of the site. Each site, as a rule, requires work using special equipment. We provide the site after clearing with special embankments. It can be crushed stone, sand and even reinforced concrete pipes that are used to remove groundwater. The embankment depends on the features of the site. Asphalt is not recommended to be laid until the completion of construction work.
A very important point is to provide housing for a construction team. For this role, a construction carriage is perfect. Building materials are folded in such a way that they are as close to the object under construction. Access to the construction site should be unhindered. It is better to store waste near the access road.
Laying temporary communications is considered the last preparatory stage. The site should be provided with power supply, water supply and sewage. After all preparatory work, the site is completely ready for the construction of the house.