Not every private sector today boasts the presence of a water supply. Therefore, many owners of houses have to take care of the supply of water into the dwelling.
First of all, the water supply plan is being developed. It should be noted in it the features of bringing pipes to the building and a detailed water supply plan in the house itself. Due to these data, it is easier to purchase the necessary materials. You also need to buy a water supply station. The removal of the well from the house and the depth of fluid lifting affects its choice. It is worth deciding on the location of the water station. It is best to place it in the underground of scrap, bathroom or boiler room. Recently, the construction of Turkish bathhouse hammams is often carried out more about this will not be superfluous to find out about this.
The next stage is the digging of trenches that serves to lay pipes. Affects its depth the level of freezing of the soil. The moat should dig up with a small margin, to surely avoid freezing of water in the pipes. When the trench is dug up, a pipe with a diameter of 3.2 cm is laid on its bottom of the PVC.
The trench should have a smooth bottom, otherwise the pipe after its instillation may be damaged or begun. One edge of the pipe should be lowered into the well, it should not reach the bottom by about 40cm. The other end is sent to the underput of the structure through the hole in the foundation, where the water station will be located.