At the first stage of the installation of this flooring, the heat -volume coating should be thoroughly laid out and firmly fix it. Then you will need a level to perfectly specifically set the beacons. And now the beacons are exhibited, and we need to make the correct mixture of sand and cement. The proportions are very important here, which make up one amount of cement into three sand preferably a large fraction.
Dear friends, if you want to do glass processing. Then we advise you to call professionals whom you can find on the site – . Also, there you can buy partitions, doors, glass products and mirrors at a low price.
Water to the mixture must be added until it acquires a consistency of thick porridge. The next step after the manufacture of the solution is styling. The mixture should be laid in small parts. Throughout the laying process, the mixture must be aligned with a special grater. Applying the rules to the beacons, you can distribute the mixture on the surface as accurately and evenly as possible.
In no case should there be voids under the rules, and the mixture should not be higher than the rules show. The half -dry screed dries very well, which excludes the possibility of the flow of the mixture to other, lower levels (floors). Half-smoked, like a wet screed, is very well suited as the basis for the installation of ceramic or any other floor tiles as the last finished coating.