The construction of the foundation begins with a visit to the company that holds excavators in Krasnodar, and rent one. Then start marking on the surface of the earth’s earth, along which it will be necessary to dig a pit (t. e. pit). Previously, the area is determined under the foundation, should be cleared of vegetation. For this, grass is dug up with the ground to a depth of 15-20cm. If the perimeter is even, then you can start digging the pit. The depth of the pit should reach about 1.5 meters. Dug pits 10-20cm is covered with sand. Masonry of a monolithic foundation is made of brick (you can use burnt or normal brick) or a bottle stone. Also, to perform work, a solution will be needed. It can be cement (cement, sand, water) or lime-cement (cement, lime, sand, water). By the way
The work is performed as follows: a layer of crushed stone or parts of brick is filled onto a layer of sand in the pit, a solution is poured on top and everything is compacted and everything is compacted. Then again the stone, solution, stone … Thus, the entire foundation pit is filled. As a rule, the strip foundation is built so that the walls are 7-11cm thicker behind the walls of the house itself. When the foundation is already completely made on top of it is covered with an insulating layer. Ideal for this role is only suitable that it fits on the cement screed.