The entire inner perimeter of the walls of foam blocks should be fixed using a wooden beam with dimensions of 50x50cm. The distance between the laid rows from the beam must be 2 cm less than the width of the insulation material. Insulation materials in our case can be, polyurethane foam or mineral wool can also be called foam. After insulation, it is worth taking care of vapor barrier. To do this, we need to lay a foil over the insulation, which has a pergamin base. This will serve as vapor barrier. At leisure it will not be superfluous to find out more about the steel circle Kyiv uses it daily.
At the end of these works, the walls must be sheathed. This can be done using OSP panels or using a wood lining. Before sheathing, materials should be treated on both sides with an antiseptic. Do not forget to leave the air pillow between foil and lining. At 25x25mm, which is stuffed on foil, a gap for the pillow is made.
The completion of construction, the floor flooring can be considered. Previously laid from the larch of the lags, and then there is a flooring of boards with dimensions of 150mm by 50 mm. It should be taken into account the moment that at the outlet of the chimney and around the furnace, it is necessary to fill the metal sheets, having previously settled asbestos under them.