Buying an apartment without proper repairs, a person for knowledge tunes himself for a fast subsequently repair blitzkrieg. Instead, he, as usual, receives a monotonous prolonged period without repair, accompanied by unsuccessful attempts to search for cheap repairman-builders. And when, because of a lack of money, his hands drop, a person gradually begins to rethink what is happening. There is a roof over your head – this is the main thing. We have a skeleton, and the muscles will increase. Flexible tiles as well as tile cladding is easy to use. Small brainstorming and output found – driving the sleeves, you can safely proceed to eliminate small defects in the premises. To do this, you just need to find the first sacrifice for the future designer-architect. Having thoroughly calculated all the traces of the feet of the legs around the apartment, it is safe to say that his kitchen room is the most visited place in the world. The most viewed area in the kitchen is the walls lined with tiles. With their repair, you can start.
How to replace tiles on the surface of the wall? When repairing tile cladding, first of all, you need to find its lagging sections by tapping by. Then you should disassemble the tile on the wall to replace or repair so as not to damage the material removed. If these products of the cladding are attached on bitumen mastic or klee, before removing them should be slightly heated (with a construction hairdryer), after which they will be conveniently disassembled.
Tiles removed from the walls are thoroughly cleaned of a mixture of the solution with a hammer or chisel, avoiding damage to the tile edges in operation. Tile material attached to the pools and mastics, is previously cleaned and washed with solvents. Wall recesses after removing the tiles, primed with a layer of solution (glue). The same layer is applied to the back of the already dried tiles. Once again, a solution is applied to the back of the tile, before installing it on the wall surface. Application of the connecting mixture is carried out in such quantities that the fastening of the purified tile material on the wall is accompanied immediately by filling the seams between the tiles with a mixture. Where the binding link is the adhesive composition and mastic, the seams can be filled after fastening the cladding on the wall.
The last stage of repair work is to clean the dry rag of the entire lined area of the wall.
Good repairs to everyone!