Complete equipment: what is

Complete equipment: what is

For example, according to the complex of second blocking 1150, the placement of temporary structures due to the lack of an individual was agreed at the PPR development stage of more than 6 months, and until December 1972. The question of temporary railway tracks for the supply of building structures in the installation of the building of the main production building was not agreed upon.

The complete equipment of the second block of 1150 was designed at the end of the forties and was manufactured at the South Ural Machine-Building Plant in 1963. For several years, the equipment was in open and closed warehouses of the Kuznetsk Metallurgical Plant. Today, new more modern materials are used in construction. Therefore, the production of windows PVC offers a lot of options for each apartment.

Complete equipment of the continuous-preparation of steam, manufactured before 1965., was in the same warehouses of the Azovstal metallurgical plant in Zhdanov.

When transferring to Krivorozhstal B cast 1150 from the Kuznetsk factory and the continuously-preparation of the Military Plant, it was found that, due to long and unsatisfactory storage of equipment in warehouses, part of the equipment was assigned or required modernization, including 120 units. Of the 2200 tons of the missing Blocking equipment, the manufacture of 1205 tons was entrusted to the Novo-Kramatorsky plant of heavy engineering (NKMZ) and 800 tons-Ural-Styazhmash (UZTM). The third plant- South Uralsky- overloaded with other orders, entrusted the duty of the general supplier, since this plant once manufactured the complete equipment of typical blocking 1150, but the plant could not fully fulfill these duties.