In case of in -line technology, equipment and machines are placed on the principle of operational passage of parts, so that the path of parts is reduced and straightened.
Workplaces or equipment, each of which is assigned a certain operation located during the technological process, provide continuous, rhythmic production of products.
The production of prefabricated reinforced concrete parts can be carried out according to the flowing-ungenerate or flowing-converia schemes.
With a wind-aggregate scheme, the reinforced concrete part in the process of forming and heat treatment together with a detachable form passes sequentially, with the necessary stops, all individual operations of the technological line, up to the turn-off.
The duration of each stop is equal to the time, which is necessary for the operation, and can be measured for minutes (vibration on the vibration site) or several hours (accelerated hardening in the heat treatment chamber).
In some cases, with a wind-aggregate scheme, an immediate lifting is also carried out, when a freshly reinforced reinforced concrete part is freed from the form to accelerated hardening. In this case, the part on the pallet makes its movement along the stream line until the end of the accelerated hardening process.
The product in the process of its manufacture, as the appropriate operation is performed, up to the delivery of finished products, is moved by various lifting equipment.
Each construction enterprise cannot do without reliable equipment. Today it is possible to use a service such as renting special equipment for the time, while you need this technique.