However, existing programs did not provide for the further automatic use of the results of the static calculation of the framework.
As a result, it was required to carry out additional work to change previously developed programs. This example also shows the appropriateness already at the first stages of introducing mechanization of engineering calculations to think over the system of using the library of standard programs for certain types of design of structures, referring to the possibility of compilation of more complex programs automatically.
In order to get a building permit, you need to go through a number of procedures.
Currently, due to imperfection of machines available in design organizations and the lack of special knowledge of the direct use of ECVM, the inevitable additional division of labor during design: the designer sets the geometric scheme, types of loads and their values, and the design engineer according to a given geometric scheme and the stress performs the calculation. It is most advisable to transfer the results of the calculation to the designer printed on the tape. Analysis of the designer of the calculation results will avoid errors that may be made in preparing the source data for calculating.
Such an organization of the relationship of the designer and machine is not the only possible. Already now there are cars that can work with specialists who are not familiar with either the machine device, or with the system of its commands and programming, and with the standard program that is used. This is achieved by the development of special systems based on the use of “problem-oriented” machine languages.