With proper planning and a fairly skillful use of time, it is quite possible to build a house in a couple of months. Build building material should be done in advance, this should be done due to drying, since you just can not do without it. You should choose a shady place, and most importantly, that it is blown from all sides. If you decide to engage in the construction of monolithic cottages or Finnish houses, then this article will be useful for you. For this construction, a columnar foundation is suitable. This will not take much time, rather, on the contrary, it will allow you to do work without much difficulties.
A house with several rooms, a toilet, a shower and a kitchen is a suburban house for a not too large family. You can build a terrace for evening gatherings. The construction of such a structure is affordable for many. It is important to properly prepare the project, since it will depend on it and the convenience of future rooms. The foundation will perfectly serve as an asbestos -cement pipes. You do not need to wait long for them to harden. The diameter of such pipes should be 20 cm. Should adhere to the distance between them in one meter.
It should be remembered that the spans in the rooms should be less than the length of the wood from which the frame was installed. This is necessary so that the structure is strong. The frame can be erected in several ways, one of them looks as follows: the lower boards are binded, the internal boards of this strapping are connected in the corners with the help of screws.
After the boards of the lower binding are connected, they should be leveled. Paul boards should be fixed around the perimeter. You must first perform the floor, and then start the walls. Broaches that will play the role of gender should be fixed in a checkerboard pattern, observing the distance of about fifty centimeters. SPO sheets play the role of walls. One sheet is fixed on the outer side of the house, and the second from the external. Installation of sheets starts from the corner.