How to prepare a work for work qualitatively

How to prepare a work for work qualitatively

Stages of work on the quality preparation of the base.

1..Removing the old flooring.

These works are carried out in several ways. One of them is milling. To do this, on an electrophreze machine, special cutters are installed, which are designed for these purposes.

To remove coatings such as linoleum or PVC tiles, if they are glued to the floor, you should take the unit called struer. In its design, a blade is provided, very sharp. It makes movements (oscillatory) and cuts the tile, linoleum. And also, tire fitting Moscow is done quickly and efficiently. The use of this unit is effective where the premises are very large. It reduces the complexity of work, and reduces the cost of their implementation.

2. Assessment of the state of concrete foundation.

After they carried out work to remove the old coating, it is necessary to look at the quality of the base, that is, to evaluate whether it is suitable for the installation of bulk floors. If so, then you can begin to carry out the following works, to milling the base and its grinding. The base is not of high quality, there are cracks, potholes, protrusions, then it must be brought into proper form.

3. Milling the base.

The concrete base has differences, influxes, and they were not removed with a grouting machine, then it is worth talking about milling the base. To do this, use special electrophreze machines. They are very effective for carrying out work to remove irregularities, influxes on a concrete basis.

4. Grinding the base.

Surface, after processing a milling machine, a very rough. Make it more smooth, with minimal differences in height over the entire area of ​​the base, an electric grinding machine will help. With its help, you can perfectly prepare the base for the installation of bulk floors.

We hope that you will learn useful information for yourself in this article.