How to put repairs in the bathroom in stages

How to put repairs in the bathroom in stages

It is hard to believe, but the bathroom is such a small room, and when repairing the apartment it “flies away” into the largest “penny”. Of course, the main amount in this case will be the purchase of plumbing, which you will install in an updated room. But even without it, the work of costly, both in terms of labor and finance, will be plenty of. First dismantling old plumbing. In this case, partial dismantling of the walls and even an increase in the doorway may also be required. After all, the new plumbing does not always correspond to the old. And part of the extra “interior” in the form of sticking pipes you will probably want to remove. The owners of apartments in the Soviet Khrushchev are faced with such dusty and troublesome, who decided to transfer their housing to the Euro standard.

If you want to completely update the walls of the bathroom and make them, say, from brick or drywall, then the repair should begin with this. And only then start wiring pipes and various electrical work. Then we return to the walls again. Now they can be faced. Then comes the most solemn and crucial moment: installing plumbing. And only at the final stage of the repair we go to the floor. We lay the tiles on it and hang new doors. The bathroom is ready.

These are the main stages. But there are still a couple of little things that you should remember. All accessories, of course, hang at the last moment. But for obvious reasons, a heated towel rail must be installed at the stage of wiring water pipes. The waterproofing of the floor is also carried out at this stage. You can take on the ceiling and lamps as soon as you facing the wall tile so that the plumbing does not interfere with this process.