Before installing laminate plates, it is necessary to perform a preparatory set of work, cleansing the flooring surface of garbage, dust and old coating. Further, the master must evaluate how flat. If various defects, hollows, distortions and irregularities are detected, the floor will have to be aligned with a cement mortar.
When the floor surface is almost perfectly flat, you can proceed to the installation of laminate plates. First, a layer of ordinary primer is applied to dried cement. Having waited for her drying, you can start laying the insulation. It is easier to perform work on flooring, when an assistant works near the master. However, one person can put a laminate. Just the process will take a little more time than planned.
First, the master determines the wall from which it is planned to lay the board. A 1 centimeter is made from it, after which the first row of laminate plates is placed along the entire length of the wall. In the next row, you need to half or at least a quarter to move the board so that the joints in the subsequent rows would be closed with a whole canvas. Further along the edge of the lock, latches are simultaneously closed. In this case, naturally laminated slabs cling to each other, forming a smooth even surface of the floor. Applying this method, the master quickly reaches the opposite wall, actually ending with laying laminate.
If at the end a whole sheet does not fit into the remaining opening, then it must be cut into parts. After laying the laminate around the perimeter of the room, the baseboard is equipped. It is desirable that he harmonizes with the color of the laminate, otherwise the baseboard will make dissonance into the overall picture.